SHAR
Production
QC Gate · 28/47 · graphics
Graphics outside safe area acceptance gate
Gate decision
HOLD · 0 / 4
01
Verification evidence is attached: Overlay the destination action and title-safe guides on every required aspect.
02
Corrective state is confirmed: Reposition or reflow graphics and verify long localized strings.
03
One accountable owner and the immutable asset or workflow version are recorded.
04
Downstream impact, exceptions and the final release decision are documented.
Reset gate
← All gates