Audio and picture timecode drift acceptance gate
Gate decision
HOLD · 0 / 4
01
Verification evidence is attached: Measure offset at the head and tail to distinguish fixed offset from clock drift.
02
Corrective state is confirmed: Correct with the verified sync reference and document any time stretch.
03
One accountable owner and the immutable asset or workflow version are recorded.
04
Downstream impact, exceptions and the final release decision are documented.